In 2002 Stroytransgaz and northwest pipeline company MunaiTas concluded a contract for turnkey construction of the Kenkiyak-Atyrau oil pipeline (Kazakhstan). The facility has a diameter of 610 millimeters and length of 448.5 kilometers.
Stroytransgaz carried out engineering work for the project, delivered materials and equipment, built the linear part of the oil pipeline, built and reconstructed three pumping stations and the terminal in Atyrau. Engineering for the oil pipeline was fulfilled by subsidiary GazNIIproekt.
We translated a number of documents related to this project: Basic Design Spec OTN System, Telephone System PABX, application software, technical proposal, project information requirement document, Fat Test Procedures and Report Trunked Radio System, Station Control System PLC/ESD, pipeline application software, Site Acceptance Test Verification Plan, SCADA System, communication systems, automation equipment and other auxiliary units.